OUR FACILITIES

ВЫПОЛНЯЕМЫЕ РАБОТЫ:

To bore main line tunnels, the company utilizes: 

 Powered tunnel boring machine (TBM) by CSM BESSAC (France)
  4 немеханизированных проходческих щита ЩН-1С диаметром 5,5м.

Specialized machinery:

  Crane lorries and Liebherr heavy-duty special-purpose chassis cranes;
  20t gantry crane;
  Wall-in-the-Soil machinery complex;
  MAZ dump trucks;
  AMKODOR front-end loaders;
  Mixer lorries;
  Concrete pump;
  Mobile power plants;
  ECODRILL drilling rig;
  Horizontal directional boring machines;
  Auger by Bohrtec (Germany);
  Bulldozer;
  Track-mounted and wheeled excavators by JCB, Volvo, etc;
  Pile driver ;
  Vibratory pile driver


MINSKMETROSTROY is the only company in Belarus that possesses unique machinery used to arrange shoring for underground structures built by the Wall-in-the-Soil method which won the title of the Best Construction Product of the Year 2017."

PROJECTS COMPLETED AND IN PROGRESS:

assets/img/portfolio/work1.jpg

MINSK METRO
1ST LINE

(Moskovskaya, 15 stations)

MINSK METRO
2ND LINE

(Avtozavodskaua, 14 stations)

MINSK METRO
3RD LINE

(under construction)