PERSPECTIVES

Minsk Metro Development Plan is a part of the Comprehensive Transportation Scheme for Minsk based on the General Development Plan of Minsk. The Plan stipulates four lines with the total of 87.9km and 63 stations

 The 1st Line (23.9km) shall consist of 16 stations and connect residential areas in the south-west and the north-east to the city centre and the railway station..

The 2nd Line (23km) shall consist of 16 stations and connect residential areas in the north-west to the city centre and the industrial zone in the south-east.

The 3rd Line (16.7km) shall consist of 14 stations and connect residential areas in the south and the north to the city centre.

The 4th Line (24.3km) shall consist of 17 stations and form a semicircle in the north, passing through the industrial zone by Dolgobrodskaya Street to Chizhovka microdistrict.

 

The 2030 Development Plan implies a metro network of three lines with the total length of 63.6km, consisting of 46 stations and three depots.

PROJECTS COMPLETED AND IN PROGRESS:

assets/img/portfolio/work1.jpg

MINSK METRO
1ST LINE

(Moskovskaya, 15 stations)

MINSK METRO
2ND LINE

(Avtozavodskaua, 14 stations)

MINSK METRO
3RD LINE

(under construction)